top of page

We provide full design services for your installation

A solid design is the foundation of an efficient biogas or biomethane installation.
A well-thought-out technological concept, the right substrate mix, and an optimized system layout ensure stable production, low operating costs, and a faster return on investment.
The design is what determines whether your installation will run reliably — today, tomorrow, and for years to come.

3.png

Installation Simulation – full engineering analysis and optimal technology selection include:

  • Informacja o miejscach przyłącza (gaz, woda, prąd, kanalizacja, droga).

  • Pełna analiza mixu substratów.

  • Propozycja technologii.

  • Wstępny layout instalacji.

  • Pełne obliczenia parametrów instalacji.

2

Consulting in:

  • substrate availability analysis,

  • LOI signing and substrate supply agreements,

  • support in selecting the optimal substrate mix,

  • support in technology selection,

  • support in selecting the EPC contractor (General Contractor),

  • support in defining the plant layout,

  • support in negotiating and signing the gas offtake agreement.

What makes us different?

With over a decade of hands-on experience, our team understands the full project lifecycle — from technology selection to gas offtake. We collaborate daily with leading suppliers and off-grid buyers to ensure efficient, future-proof solutions.

© 2025 by Sphere Constructions. Proudly created withWix.com

bottom of page